Piling and Foundation Equipment

Continuous Flight Auger Rigs

Rigs that drill with a continuous auger and place concrete through the stem as the auger is withdrawn. Fast and quiet in suitable ground, with no casing and no support fluid.

Features

  • Concrete is pumped through the auger stem during extraction, so the bore is never left unsupported.
  • Reinforcement is pushed or vibrated into the fresh concrete, which limits practical cage length compared with a bored pile.
  • Output is high in consistent cohesive and granular strata; obstructions and hard rock stop the method rather than slowing it.
  • Auger torque, extraction rate and concrete pressure are monitored together, because the relation between them is the quality record.
  • Mast height has to suit the full auger string, which is often the constraint on sites with overhead restrictions.

Specifications

Figure Typical range Unit Why it matters
Maximum torque 150 - 400 kNm Sets auger diameter and the strata that can be drilled.
Maximum pile diameter 400 - 1 200 mm The method's practical diameter range is narrower than bored piling.
Maximum depth 18 - 35 m Limited by auger string length and mast height.