Piling and Foundation Equipment

Diaphragm Wall Grabs and Cutters

Rope-suspended and hydraulic grabs, and hydromills, for excavating diaphragm wall panels under support fluid. Panel dimensions and verticality control are the specification.

Features

  • Grab jaw width and length set the panel thickness and bite length, which set the panel joint layout for the whole wall.
  • Grab mass and jaw geometry decide penetration in stiff clays and dense granular ground.
  • Hydraulic grabs give better verticality control than rope-suspended grabs and correct deviation as they descend.
  • Hydromills cut through rock and obstructions that a grab cannot, at higher cost per cubic metre and with a slurry treatment plant.
  • Verticality monitoring and recording per panel is what the completed wall is accepted against.

Specifications

Figure Typical range Unit Why it matters
Panel thickness range 600 - 1 500 mm Has to match the wall design and the guide wall built for it.
Bite length 2 200 - 3 200 mm Sets panel joint layout across the whole wall.