Concrete Consolidation Equipment

Power Trowels and Vibrating Screeds

Walk-behind and ride-on power trowels, vibrating beam screeds and truss screeds for floating and finishing slabs. Timing against the concrete's set governs the result more than the machine does.

Features

  • Float pans are used for the early passes and blades for finishing; changing over too early or too late shows in the surface.
  • Ride-on trowels cover large floor areas quickly but cannot reach edges and corners, so a walk-behind machine is still needed.
  • Vibrating beam screeds strike off and level in one pass and are specified by the span they can cross without deflecting.
  • Truss screeds cover wide bays on a supported frame and are the usual answer on industrial floor pours.
  • Blade pitch adjustment is what keeps the machine working as the surface hardens through the finishing window.

Specifications

Figure Typical range Unit Why it matters
Rotor diameter 600 - 1 200 mm Sets floor area covered per hour and access around obstructions.
Machine type walk-behind / ride-on Large floors need both - a ride-on cannot finish edges.
Screed working span 3 - 12 m Governs bay width and the number of joints in a floor.
Blade pitch adjustment manual / from the handle Has to be changed as the slab stiffens through the finishing window.